By Nick Smirnoff
NPPA 

Union Pacific upgrades interior of tunnel 10 near the Loop

The Loop's Local Scene

 

August 3, 2019

Nick Smirnoff (NPPA)

After the removal of the old rail and ties, a new roadbed was graded inside of the West Portal of Union Pacific's Tunnel 10 just east of the Loop. Recent rains and ground seepage had made the existing track age unstable for rail operations. Welders pictured below are awaiting the arrival of a section of pre-constructed trackage. As the rail sections are slid along the existing track, a crane attachment (pictured bottom right) will lift it onto the newly constructed roadbed, where the welders will attach each section together.

Nick Smirnoff (NPPA)

Tunnel 10 east portal as a train passes on the recently completed double track upgrade.

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 04/24/2024 08:48